Hydrogen Engine Test Bench

The FKFS has an engine test bench approved by the German Technical Inspection Agency for hydrogen operation. Two dynamometric brakes are available for them. The commercial vehicle dynamometric brake is located in the adjacent test chamber and is connected with the hydrogen engine test bench by means of a wall bracket. An industrial transmission can be interposed as an option. The automobile dynamometric brake is located inside the test chamber and is fitted with a capsule for hydrogen operation that is ventilated from the basement.

The electrical equipment features an explosion protection design. The test bench has two independent ventilation systems. Gas sensors monitor the room and switch off the hydrogen supply via an alarm system if they are tripped. The alarm system incorporates additional safety functions.

Contact

Dipl.-Ing. Hans-Jürgen Berner

Ph.: +49 711 685-65714

Technische Daten

Hydrogen Supply

Technische Daten

Test Bench

Pmax

Mmax

nmax

Remarks

 

[kW]

[Nm]

[min -1]

Options

Function test bench

350 1.000 9.000 also CNG

Hydrogen Supply

The hydrogen is supplied via four large cylinder groups each with 41 cylinders. It is initially operated using three groups. When a lower pressure limit is reached, the fourth group is used as the supply and a compressor buffers the remaining content of the first three groups into the fourth one.

 

Hydrogen storage 164 cylinders each with 50 liters
Storage volume 1440 Nm3
Energy content corresponds to 420 liters diesel equivalent
Pressure range 10 to 200 bar
Maximum flow rate 700 Nm3/h
Filling time Overflow from trailer